Airports

With 27 years of experience in airports, Latersolo appeals with its knowledge in Project Executive Airport Infrastructure :

 

  • Passenger terminal;

  • Runway and taxiway;

  • Horizontal and vertical signaling;

  • Pavement Design;

  • Safety and economic viability;

  • Audits, Inspections , Reports;

  • Construction management;

  • Quality control and quality;

  •  Quality  Project Certification;

  • Obstacle Limitation Surfaces Project;

  • Diagnosis tests and recovery runway pavement project.

AEROPORTO LIMEIRA

Among its clients are:

  • GRU Airport

  • OAS

  • EMBRAER

  • Limeira City Hall

  • Araras City Hall

  •  Mineradora Rio do Norte  -MRN

  • Fidens Engenharia

  • State of Rio Grande do Sul

  • Construtora Sucesso

Main Projects:

GRU AIRPORT – INTERNATIONAL GUARULHOS AIRPORT

International Guarulhos Airport, São Paulo. Brazil. 2013-2016

  • Objective evaluation of the concrete pavement of the apron;
  • Recovery project from the concrete pavement of the apron;
  • Quality Control and supervision of the runway resurfacing work ;
  • Runway longitudinal and traversal international roughness index (IRI);
  • Diagnosis tests of the  runway pavement and the recovery project.

OAS – INTERNATIONAL GUARULHOS AIRPORT

International Guarulhos Airport, Sao Paulo. Brazil. 2014

  • Quality Project Certification of the PRA  taxiway;
  • Quality Project Certification from the Firefight access;

EMBRAER– GAVIAO PEIXOTO AERODROME

Gavião Peixoto Aerodrome, Gavião Peixoto. Brazil. 2016

  • Quality Control and supervision of the runway resurfacing work ;

 

LIMEIRA CITY HALL

Limeira International Airport, Sao Paulo. Brazil. 2010-2012

Architecture:

  • Airport Planning zone;
  • 3mi pax terminal ;
  • Heliport;
  • Control tower;
  • Firefight plan;
  • Pedestrian Access;
  • Apron;

Engineering:

  • Runway Executive Signaling Project;
  • Runway Vertical Light Executive Project ;
  • Parking lot Geometric Executive Project;
  • Geotechnical study management and quality control;
  • Pavement Project and runway draining  PCN = 61/F/D/W/T- PML
  • Runway and taxiway geometric project (3600 m x 45 m B 767-400 aircraft);
  • Runway and taxiway geometric  project (3800 m x 45 m para aeronaves B 767-400);

Infrastructure

  • Intersection SP 147 Road Project;
  • Preliminary Project of the railroad City Center-Limeira.

ARARAS CITY HALL

Armando Américo Fachini Municipal Airport, Araras. Sao Paulo. 2014-2015

Architecture

  • Preliminary  passenger terminal project;

Engineering

  • Geometric readjustment of the airport runway;
  • Obstacle Limitation Surfaces Project.

FIDENS ENGENHARIA

1) International Catoca Airport – Saurimo, Angola. 2009-2011

Architecture

  • Executive Project of the passenger terminal – 1mi pax.

Engineering

  • Runway Geometric Executive Project (2420m x 30m);
  • Runway Geometric Executive Project PCN = 46/F/B/W/T (2420m x 30m);
  • Runway Drainage  Executive Project  PCN = 46/F/B/W/T (2420m x 30m);
  • Holding Bays Geometric Executive Project;
  • Apron and Runway Drainage Executive Project;
  • Apron and Runway Signalling Executive Project;
  • Quality Control and and Construction Control.

MRN MINERAÇÃO RIO DO NORTE

Porto Trombetas Airport,  Pará. Brazil. 2012

  • Runway and Apron Geometric Executive Project;
  • Runway and Apron vertical and horizontal signalling;
  • Runway extension Project to B737-800 aircraft operations;
  • Apron extension Project to EMB 190/195 e B 737-800 operations;
  • Runway and Apron restoration Project.

MARCILIO ENGENHARIA

1) Fazenda Caraibas Aerodrome, Mato Grosso do Sul. Brazil

  • Runway and Apron Geometric Executive Project;

2) Macaé Airport, Rio de Janeiro. Brazil. 2010

  • Runway, taxiway and apron project revision;

USIMINAS

Prata Aerodrome, Minas Gerais. Brazil. 2010

  • Runway and apron executive project;

FERREIRA CONSULTORIA

1) Ipatinga Airport, Minas Gerais. Brazil. 2010-2011

  • Runway, taxiway and apron project;

2) USIMINAS Airport, Minas Gerais. Brazil. 2009

  • Runway, taxiway and apron executive Pavement Project.

STATE OF RIO GRANDE DO SUL

PELT – Plano Estadual de Logística e Transportes. Brazil. 2014

  • Airport planning study of the Rio Grande do Sul State for the next 25 years;

CONSTRUTORA SUCESSO

São Raimundo Nonato – Airport.Brazil. 2015

  • Operational Condition Evaluation of the São Raimundo Nonato Airport

Barra Aeroportos